Terms & Conditions
We ask for a 50% payment upfront before any work starts then full balance within 14 days of completion.
![Borehole drilling on a farm](https://geothermaldrilling.co.uk/wp-content/uploads/2023/03/Borehole-drilling-on-a-farm.png)
![civil-engineering-1](http://geothermaldrilling.co.uk/wp-content/uploads/2023/02/civil-engineering-1.png)
Completed Project on a farm. From start to finish.
![Borehole drilling on a farm](http://geothermaldrilling.co.uk/wp-content/uploads/2023/03/Borehole-drilling-on-a-farm.png)
Borehole drilling
![borehole capped off Borehole capped off](http://geothermaldrilling.co.uk/wp-content/uploads/2023/03/borehole-capped-off-1.png)
Borehole capped off
![Flushing water through until clear Flushing water through until clear](http://geothermaldrilling.co.uk/wp-content/uploads/2023/03/Flushing-water-through-until-clear.png)
Flushing water through until clear
![Water testing Water testing](http://geothermaldrilling.co.uk/wp-content/uploads/2023/03/Water-testing.png)
Water testing
![Pressure vessel Pressure vessel](http://geothermaldrilling.co.uk/wp-content/uploads/2023/03/Pressure-vessel.png)
Pressure Vessel
Geothermal Drilling UK
Borehole Drilling. For domestic through to Industrial clients in Herefordshire, Worcestershire, Gloucestershire, West Midlands and South Wales.